AVP4 Avant-Poste 4 – Imm. Link

Lausanne
Category
AIO, Refurbishment and addition of floors
Tags
penthouse, roof glazing, steel structure, stick system
About This Project

 

Project

Refurbishment and construction of 2 additional floors to an existing administrative building from the late 70s

 

Work description

Additional floors: Steel structure ~60 tons (Vierendeel truss).

Existing glazing: removal and disposal.

Existing concrete: reinforcement to take the weight of the new façade.

New façade:

– Sottas 50 stick system façade (ground floor)

– 200 nos. aluminium units with fixed glass and manual ventilation opening panel concealed behind light grey sheets

– Ventilated facade in 4mm aluminium sheets

Penthouse:

– Exterior venetian blinds and cassette awnings

– Aluminium timber composite windows

Skylights:

– 2 nos. skylights to the roof mounted in one piece (5.0 x 3.2 m)

– Ground floor rooflight used as a glazed floor

 

Completion

2016

 

Client

Vaudoise Assurances

 

Architect

Magizan architecture et urbanisme

 

Facade consultant

Préface Sàrl