MOB – PONT DU LANCIAU

Rossinière (line Montreux-Zweisimmen)
Category
Infrastructures - bridges - footbridges, Steel structure
Tags
circular hollow section, exc4, steel structure, three-dimensional, truss
About This Project

 

Project

Demolition of existing bridge and construction of a new bridge 

 

Work description

In consortium: Sottas SA leading – Walo Bertschinger SA 

Structure composed of three-dimensional metallic truss (made up of circular hollow section) and of reinforced concrete trough, slipping of structure up to its final location.  

Execution class EXC4  

(~100 tons) 

Length: ~48.0 metres 

Width:     ~6.0 metres 

Height:    ~4.5 metres  

 

Completion

2018

 

Client

Compagnie du Chemin de Fer Montreux Oberland Bernois SA

 

Engineer

T ingénierie SA

 

See de movie: https://youtu.be/qSWXzpAfaQw